Major Modifications – Dec 2012 December 4, 2012 Stanford Pride was completely refurbished/ upgraded to be utilized as a front runner for a long-term contract awarded by Maersk Oil Qatar. The vessel was upgraded to DP1 and obtained a rebuilt notation from ABS. Back Quick links Services Careers Download Annual report Download